Friday, June 29, 2012

A.Lamp Concrete Contractors continued to install water main and fire hydrants along the project site including the connection to the existing water main along Sunset Ridge Road.

A. Lamp Concrete Contractors is anticipating to complete the open cut water main installation next week, along with disinfecting and testing the new water main.  The contractor also anticipates working on the sanitary sewer replacement along Mickey Lane.

All roadway and driveway access will be restored as soon as possible and at the end of each working day.  Thank you in advance for your patience during this process.

Have a Happy 4th of July.

Friday, June 22, 2012

A.Lamp Concrete Contractors began open cut water main installation along Mickey Lane and Burr Oak.  Water main testing is anticipated to begin late next week.

We do not anticipate any water shut-downs in the next week.  The first anticipated water shut down will occur when the individual water services are installed. Notification will be given prior to shutting the water off to your residence.  Water services are not scheduled to begin until after the July 4th Holiday.

Although we do not anticipate any water main shut-downs, the possibly always exist for an emergency shut-down.  In these instances, you will be notified as soon as possible.

A. Lamp Concrete Contractors will continue to perform open cut water main installation, sanitary sewer replacement along Mickey Lane, and underground utility repairs during the next week.

All roadway and driveway access will be restored as soon as possible and at the end of each working day.  Thank you in advance for your patience during this process.

Friday, June 15, 2012


RJ Underground completed the directional drilling of the 8-inch PVC water main along the project site. A. Lamp Concrete Contractors began underground utility repairs and open cut water main installation.

A. Lamp Concrete Contractors will continue to perform open cut water main installation, sanitary sewer replacement along Mickey Lane, and underground utility repairs.

During the open cut water main, sanitary sewer installation, and utility repairs, getting around the neighborhood will be a little more difficult due to space required to perform this work.  Driveway access may also be restricted during this work.  Residents will be notified prior to driveway access being restricted.

All roadway and driveway access will be restored as soon as possible and at the end of each working day.  Thank you in advance for your patience during this process.

Friday, June 8, 2012


A.Lamp Concrete Contractors and their sub-contractor, RJ Underground, have continued to directional drill the new 8-inch water main along Burr Oak Drive. Last week water main was installed along Burr Oak Drive (East) to Sunset Ridge Drive. Directional Drilling of the water main is nearly complete.

Next week Lamp Concrete Contractors will work on underground utilities.

Friday, June 1, 2012



A.Lamp Concrete Contractors and their sub-contractor, RJ Underground, have continued to directional drill the new 8-inch water main along Burr Oak Drive. Last week water main was installed along Burr Oak Drive (East). Due to the shortened holiday week and rain, work was limited on-site.

Next week RJ Underground will continue to directional drill water main along Burr Oak Drive (East). A. Lamp Concrete Contractors will work on storm sewer replacements and open cut water main.